A little more work on the frame to be done. Completed the gable frame this afternoon and will line it all up and fasten the lot in the next couple of days. Also need to ensure the television bracket will sit on framing studs but apart from that it'll be ready to clad. I can also ring the bloke to instal the antenna as well as run the cable from the roof.
Tuesday, 15 January 2013
Thursday, 10 January 2013
Continue with the mezzanine.
Holidays are here and the weather has been hot. Now is the time to continue with the shed preparation. Today I worked on the wall and mezzanine at the storage end. Made the frame and fastened the chipboard cladding to it. Also added the 16mm chipboard to the mezzanine and then Michele and I relocated as many of our belongings into the storage area. Once we return from our trip to Rye I'll continue to build the second side of the wall.
Subscribe to:
Posts (Atom)