Before I could build the new shed, I had to dismantle the old one and re-position the pool filter. I started with storm water and trenches for the pool filter. Once these were installed I dismantled the shed, with assistance from Lach, Cal and Pete. That just left the slab to be removed. A jack hammer, a 3 metre skip and 2 days work was all it took. Add a morning to fill the skip and we had an empty corner for the first time in 18 years.