Monday, 2 January 2012
Steel work begins
While all of the previous works were planned and completed I had also been working with Mick Chandler on the design of the shed and how he could weld it all up to make it all fit together. He built me some perfect footings which had been set into the slab and the intention was to bolt the steel structure onto the footings as we assembled it. A bit risky and exacting work but our careful preparation meant, once the structure was delivered, it would bolt together without a hitch. It's great to work with people who have the same attention to detail as myself. Mick did an outstanding job.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment