Saturday 23 June 2012

Organise the inside

While I'm waiting for the doors to be made I've started to organise the inside. A bit of work because I need new benches and storage. Making these from scratch all at a height of 900mm. Most will have castors to assist with mobility and rearrangement etc. and I'll add as many drawers as I can to keep things dust free and organised. The bench I'm making is really just a frame to enclose four old drawer sets I salvaged from teachers desks we were throwing out at school. Have a couple more I'll bring home during the holidays so I can complete another trolley at 900mm. This will double as an outfeed table for the saw bench and thicknesser. Once these are done the old stuff gets demolished.


Saturday 2 June 2012

Spouting complete

Today I connected the downpipes and diverted all water into the tank. As simple as a string line, a few brackets and 90mm storm water pipe. Only took an hour or so and we are only one step away from the final inspection. Last job is to complete the doors. See Mick Chandler this week with a plan and I should be complete by the start of July school holidays.