Saturday 21 July 2012

Hanging the doors.

Picked up the door frames on Friday evening and worked on the preparation of the door trims today. Finally worked my way through the necessary cutting and measuring of the those and once finished they really add a completed look. Once they were installed I did a quick fit of the doors. The single door is a bit tight and will need some attention tomorrow before I can fit that, however once Cal returned from training I used him and we fitted the double doors.  They'll need some final adjustment as well tomorrow but once that's done I can add the spandek cladding and install the locks etc. It's nearly all done!





Thursday 12 July 2012

The power is on!

Bomber and the boys (Jarred and Adam) arrived at 7.45 as planned. A quick discussion of the plan and then they got into it. Finished at 1.00pm. Took a while installing the conduit, switches and lights but once it was done...sensational. Made provision along the way for a sensor light and lights under the mezzanine floor once its built. A great job, now for the doors.






Tuesday 10 July 2012

Preparing for the electrician and installation of doors

A few things are happening behind the scenes in preparation for the electrician on Thursday. I bought the new lights and mounted the single ones this morning before turning to the placement of power points and light switches. I also cut the battens for the power points so I can work with the electricians as they instal the switches. Spoke to Cal about collecting the door frames from Mick and expect to have them available tomorrow. Inside, I've been preparing the bits and pieces I need once the shed has been completed. Made the top of my new workbench, planed it flat and have worked out the placement of the vices I'm going to use. Researched the placement of "dog holes" and will complete the bench as soon as possible.